We cannot change the weather. We can change how prepared this ward is.
At the airport on July 1, about double the previous record
At Britannia in about five hours
Flood-related service requests in Ward 9 by July 10
Residents who lost power
Canada Day 2026 was not only a rainfall record. It was record rain, a storm concentrated on the west end, drainage that could not keep up, closed roads, flooded basements and a widespread power outage, arriving together. The airport recorded 118.4 mm, about double the previous July 1 record. Britannia recorded 167 mm in about five hours, Colonnade 151 mm and Nepean 144 mm. The City has described the Britannia reading as beyond a 1-in-200-year event. More than 30,000 residents lost power.
Knoxdale-Merivale was one of the three hardest-hit wards. As of the morning of July 10 the City had logged 684 flood-related service requests in Ward 9. With Bay and College, this ward accounted for about 83 percent of those requests. City-wide, basement-flood reports later approached 7,000. Ottawa Fire Services answered more than 700 storm calls across the city, including electrical hazards and downed wires. In this ward the weak spots were the ones residents already know: Craig Henry, Tanglewood, General Burns, and Graham Creek in Trend-Arlington, where the creek overran its culverts. Heavy rain returned on August 10. It was a smaller storm. It was not a reason to wait.
City staff have already said this storm exposed weaknesses in the stormwater system. A ward councillor cannot replace that system alone. What a councillor can do is force a public review, turn it into a funded list, and get practical help onto the streets that have already flooded before the next July. Priority is the order of the work, not a blank cheque.
“The City already knows the weak pipes, the blocked culverts and the homes that have flooded before. I will put those projects ahead of new towers, and get pumps and rebate help onto those streets before I spend a term designing a new department.”
Glen Cairn is the local proof that a flooded neighbourhood can be treated as a program, not a complaint. After repeated flooding, including a July 2009 storm that damaged about 1,200 homes, most of them in Glen Cairn, the City delivered more than 30 flood-mitigation projects, exceeding $35 million, and finished nearly a year ahead of schedule. The failure before that was a report, after the 2002 flood, that sat unused.
That is the standard I will apply here. Not another study for the shelf. An independent review, done by an engineer who does not report to the division that built the system, with one product: a public, ranked, costed list, and a funding path, on a deadline. Glen Cairn’s lesson is the delivery.
If elected, I will move for that review in the first months of the term. It covers the streets that flooded, not the whole city in general.
This is the work that does not wait for the review to finish. It does not require a new agency.
The point of staging is practical: faster reopening of closed roads, less strain on crews who would otherwise arrive late, and quicker protection of water facilities, transit routes and electrical substations. Those are the results to measure. They are not a guarantee.
Designate Craig Henry, Tanglewood, General Burns and the Graham Creek corridor as priority flood-mitigation zones, and build the program around the independent list.
Many basements took water because the public system was overloaded and the water came onto private property. The programs to help already exist. They were not in front of the homes that needed them.
I will ask Council to integrate the rain gauges, weather radar, sewer monitors and creek-level sensors the City already owns into one operational picture, and to send geo-targeted alerts to the neighbourhoods in the path of a storm. When a rainfall threshold is crossed, the pre-set response should already be written down: where the pumps go, which roads close, who is called. A public street-level map should show the same picture residents are being warned about.
I will not put a number of minutes on that warning. On July 1 a large share of the rain fell in a few hours. The target is earlier notice than residents had, and crews already moving when the warning is issued, so fewer vehicles are left on flooded roads. The commitment is the alert and the staging.
The long argument is simple. Stop waiting for the pipe to fail.
The goal is to reduce the chance of a repeat before next summer, and to have a funded program underway in this term. The sequence is:
Before the next storm: clear known culverts and catch basins, stage pumps and barriers, knock on doors that have already flooded.
Independent review, on the Glen Cairn model: a public, ranked, costed list, with a deadline. Not a report that sits.
The Ward 9 program: priority zones, a public flood-risk map, annual reporting, and pipe and conveyance upgrades in the order the review ranks them.
Residential retrofits, paid for first from the stormwater charge and capital dollars already in the system.
Hyper-local alerts and pre-set responses, built on sensors the City already owns.
Preventive maintenance, and no new upstream intensification until the pipe is funded.
That combination deals with the immediate vulnerability in Craig Henry, Tanglewood, General Burns and along Graham Creek, and it builds the longer program those streets have not had. Glen Cairn showed what a funded list can do. Ward 9 should not have to flood again to get one.
Ward 9, morning of July 10: 684 flood-related service requests. Bay had 1,512 that morning and College 2,282. Those are service requests, not a final basement count, and the 1,512 is not a Knoxdale-Merivale number. City-wide basement-flood reports later approached 7,000. The more than 700 Fire Services calls for electrical hazards, downed wires and other storm emergencies are a city-wide total. Glen Cairn: more than 30 flood-mitigation projects, exceeding $35 million, reported complete in November 2016, nearly a year ahead of schedule.
Anna Ielo-Tal · Candidate for City Councillor, Ward 9, Knoxdale-Merivale. This note is for residents and for the campaign. It is not a City of Ottawa document. Election day is October 26, 2026.